Discover Opportunities months before the RFP drops
Learn more →Work includes qualified audio/visual contractors for the removal and replacement of the existing sound system. The project involves the safe removal of all existing sound equipment and the installation of a modern, high-quality sound system designed for athletic, public speaking, and event use. The contractor will be responsible for: Site evaluation. Complete removal and disposal of existing audio equipment (including speakers, amplifiers, processors, cabling, and control systems). Responsible for insuring that no damage to hardwood floor happens during installation. Design and installation of a new, high-performance sound system with: Clear audio coverage throughout the arena. High speech intelligibility and dynamic range for music playback. Integration with existing AV or scoreboard systems (if applicable). Durable equipment suitable for large, multi-purpose indoor venues. All associated wiring, mounts, conduits, racks, and hardware. System tuning, testing, and optimization for performance
Posted Date
Aug 21, 2025
Due Date
Sep 4, 2025
Release: Aug 21, 2025
Close: Sep 4, 2025
Work includes qualified audio/visual contractors for the removal and replacement of the existing sound system. The project involves the safe removal of all existing sound equipment and the installation of a modern, high-quality sound system designed for athletic, public speaking, and event use. The contractor will be responsible for: Site evaluation. Complete removal and disposal of existing audio equipment (including speakers, amplifiers, processors, cabling, and control systems). Responsible for insuring that no damage to hardwood floor happens during installation. Design and installation of a new, high-performance sound system with: Clear audio coverage throughout the arena. High speech intelligibility and dynamic range for music playback. Integration with existing AV or scoreboard systems (if applicable). Durable equipment suitable for large, multi-purpose indoor venues. All associated wiring, mounts, conduits, racks, and hardware. System tuning, testing, and optimization for performance
Provide internal connections. The district is updating their existing cisco switches. No installation is needed.
Posted Date
Sep 30, 2024
Due Date
Nov 12, 2024
Release: Sep 30, 2024
Close: Nov 12, 2024
Provide internal connections. The district is updating their existing cisco switches. No installation is needed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis