Discover Opportunities months before the RFP drops
Learn more →Provide ADA Paratransit Management Services.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Close: Jan 29, 2026
Provide ADA Paratransit Management Services.
AvailableRepair the existing roof drain line system. The primary scope of work will consist of replacing and rerouting the existing storm drain lines with new drain lines and the addition of secondary drains. At the roof level, new secondary (emergency) overflow drains will be installed. At the attic level, existing vertical drain lines will be cut and capped, and new drain lines will run into the lower floors, enclosed in a new chase. At the first-floor level, there will be limited demolition of the masonry and brownstone to install two emergency overflow outlets, one at each of the vestibules to the side of the great hall. The primary drains will continue below grade, one vertical line at each of the vestibules, and will connect at a new manhole below the sidewalk. Downstream of the new storm manhole, the existing drain line that connects to the gully brook storm sewer will be removed and replaced with a new pipe. All drainage work outside of the building will involve demolition of the concrete sidewalk panels and pavers and roadway asphalt to install new pipe. The hardscaping of the site will be restored to the existing conditions.
Posted Date
Oct 10, 2025
Due Date
Dec 5, 2025
Release: Oct 10, 2025
Close: Dec 5, 2025
Repair the existing roof drain line system. The primary scope of work will consist of replacing and rerouting the existing storm drain lines with new drain lines and the addition of secondary drains. At the roof level, new secondary (emergency) overflow drains will be installed. At the attic level, existing vertical drain lines will be cut and capped, and new drain lines will run into the lower floors, enclosed in a new chase. At the first-floor level, there will be limited demolition of the masonry and brownstone to install two emergency overflow outlets, one at each of the vestibules to the side of the great hall. The primary drains will continue below grade, one vertical line at each of the vestibules, and will connect at a new manhole below the sidewalk. Downstream of the new storm manhole, the existing drain line that connects to the gully brook storm sewer will be removed and replaced with a new pipe. All drainage work outside of the building will involve demolition of the concrete sidewalk panels and pavers and roadway asphalt to install new pipe. The hardscaping of the site will be restored to the existing conditions.
The Greater Hartford Transit District seeks proposals from qualified marketing and communications firms to provide marketing, advertising, web design, content management, social media, print, and other promotional services for its public transportation services. The services are required for the Union Station Transportation Center Complex and the ADA Paratransit Operations and Maintenance Facility.
Posted Date
Oct 10, 2024
Due Date
Nov 13, 2024
Release: Oct 10, 2024
Close: Nov 13, 2024
The Greater Hartford Transit District seeks proposals from qualified marketing and communications firms to provide marketing, advertising, web design, content management, social media, print, and other promotional services for its public transportation services. The services are required for the Union Station Transportation Center Complex and the ADA Paratransit Operations and Maintenance Facility.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis