Discover Opportunities months before the RFP drops
Learn more →The Project consists of scraping off and disposal of asbestos containing popcorn ceilings, repair with drywall compound and painting.
Posted Date
Oct 15, 2025
Due Date
Oct 31, 2025
Release: Oct 15, 2025
Close: Oct 31, 2025
The Project consists of scraping off and disposal of asbestos containing popcorn ceilings, repair with drywall compound and painting.
Replace failed sections of exterior piping and insulation at heat pumps.
Posted Date
Sep 23, 2025
Due Date
Oct 10, 2025
Release: Sep 23, 2025
Close: Oct 10, 2025
Replace failed sections of exterior piping and insulation at heat pumps.
Removal and disposal of existing asphalt shingle roofing, including flashing, drip edge, gutters, downspouts and fascia. Removal and disposal of bottom 24” of plywood sheathing. Installation of new Simpson Hurricane anchors, installation of new sheathing to match removed. New asphalt shingle roof over #15 felt, Ice and Water Shield and including all flashing, step flashing, drip edge, new gutters and new downspouts, etc.
Posted Date
Nov 6, 2024
Due Date
Nov 20, 2024
Release: Nov 6, 2024
Close: Nov 20, 2024
Removal and disposal of existing asphalt shingle roofing, including flashing, drip edge, gutters, downspouts and fascia. Removal and disposal of bottom 24” of plywood sheathing. Installation of new Simpson Hurricane anchors, installation of new sheathing to match removed. New asphalt shingle roof over #15 felt, Ice and Water Shield and including all flashing, step flashing, drip edge, new gutters and new downspouts, etc.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis