Discover Opportunities months before the RFP drops
Learn more →This RFP is for the replacement of the waterline underground heat loop at Ware State Prison.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
This RFP is for the replacement of the waterline underground heat loop at Ware State Prison.
AvailableReplacement of the heating and domestic hot water boilers; replacement of two air-cooled with preparations for a third chiller in a future project; demo of existing chiller equipment pads to be replaced with an extension; replacement of all chilled water, hot water, and domestic hot water piping, pumps and all appurtenances in the boiler room and all underground pipe up to the chiller pad; replacement of air handlers, ductwork and all appurtenances in the boiler room; new chilled and heating water chemical treatment system.
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Close: Jan 14, 2026
Replacement of the heating and domestic hot water boilers; replacement of two air-cooled with preparations for a third chiller in a future project; demo of existing chiller equipment pads to be replaced with an extension; replacement of all chilled water, hot water, and domestic hot water piping, pumps and all appurtenances in the boiler room and all underground pipe up to the chiller pad; replacement of air handlers, ductwork and all appurtenances in the boiler room; new chilled and heating water chemical treatment system.
AvailableThe Georgia State Financing and Investment Commission, on behalf of the Georgia Department of Natural Resources, is soliciting bids to remove nine existing residential cabins and construct ten new cabins at Stephen C. Foster State Park in Fargo, GA. A mandatory pre-bid conference is scheduled for December 4, 2025, and bids are due (bid opening) on December 23, 2025; submissions are handled via the buyer's procurement system.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
The Georgia State Financing and Investment Commission, on behalf of the Georgia Department of Natural Resources, is soliciting bids to remove nine existing residential cabins and construct ten new cabins at Stephen C. Foster State Park in Fargo, GA. A mandatory pre-bid conference is scheduled for December 4, 2025, and bids are due (bid opening) on December 23, 2025; submissions are handled via the buyer's procurement system.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis