Discover Opportunities months before the RFP drops
Learn more →Construction of the electric primary feeder system for the pure flavor greenhouse expansion. This will be a 25KV primary system that will be a mixture of overhead primary lines and underground primary lines along with transformers and switch-gear (Scope of work and drawingsare included with this packet). Project Scope: Consists of setting three Ductile Iron poles: 50/H9 approx. 4,970 Lbs each. Install twenty-two, 45/2 wood poles. Install 6" Sch40 PVC combined length of approx. 2500 FT. Install approx. 2500 FT combined length of 1000mcm 3 phase primary cable. Install 24 1000mcm T-Bodies. Install 7 Gang operated RLB switches. Install 1 PME-10 Switch Cabinet. Install 18 1000mcm Terminators. Install 336 ACSR combined length of approx. 20,000 FT. Install 70 336 Perform top ties. Install approx. 3,000 FT combined length of 1/0 25kv cable. Install approx. 2,000 FT combined length of 4/0 25kv cable. Install 4 –25KV 3000KVA Transformers 277/480. Install 1000mcm feeder from substation to metering cubicle. Change out existing PME-10 to metering cubicles. Install two new metering cubicles on top of existing vault. Conduits will be Stubbed outside the substation fence by MEAG Power. The contractor will be responsible for maintaining the phasing of all tie points.
Posted Date
Oct 31, 2025
Due Date
Dec 17, 2025
Release: Oct 31, 2025
Close: Dec 17, 2025
Construction of the electric primary feeder system for the pure flavor greenhouse expansion. This will be a 25KV primary system that will be a mixture of overhead primary lines and underground primary lines along with transformers and switch-gear (Scope of work and drawingsare included with this packet). Project Scope: Consists of setting three Ductile Iron poles: 50/H9 approx. 4,970 Lbs each. Install twenty-two, 45/2 wood poles. Install 6" Sch40 PVC combined length of approx. 2500 FT. Install approx. 2500 FT combined length of 1000mcm 3 phase primary cable. Install 24 1000mcm T-Bodies. Install 7 Gang operated RLB switches. Install 1 PME-10 Switch Cabinet. Install 18 1000mcm Terminators. Install 336 ACSR combined length of approx. 20,000 FT. Install 70 336 Perform top ties. Install approx. 3,000 FT combined length of 1/0 25kv cable. Install approx. 2,000 FT combined length of 4/0 25kv cable. Install 4 –25KV 3000KVA Transformers 277/480. Install 1000mcm feeder from substation to metering cubicle. Change out existing PME-10 to metering cubicles. Install two new metering cubicles on top of existing vault. Conduits will be Stubbed outside the substation fence by MEAG Power. The contractor will be responsible for maintaining the phasing of all tie points.
AvailableConstruction of two metal buildings measuring 40' wide x 130' long x 16' tall and 10' wide by 13' tall openings including a concrete pad measuring 140 FT by 160 FT (approximately 450 yards of concrete), 6 inches thick with wire mesh reinforcement.
Posted Date
Oct 30, 2025
Due Date
Dec 2, 2025
Release: Oct 30, 2025
Close: Dec 2, 2025
Construction of two metal buildings measuring 40' wide x 130' long x 16' tall and 10' wide by 13' tall openings including a concrete pad measuring 140 FT by 160 FT (approximately 450 yards of concrete), 6 inches thick with wire mesh reinforcement.
Installing 8" pipe in the road along with 16 service transfers. Work will include approx.. 100 LF of jack & Bore, 3 complete fire hydrants, curb & gutter replacement, cut & cap ex. Waterline, etc., traffic control, erosion control, and other miscellaneous work.
Posted Date
Oct 6, 2025
Due Date
Nov 6, 2025
Release: Oct 6, 2025
Close: Nov 6, 2025
Installing 8" pipe in the road along with 16 service transfers. Work will include approx.. 100 LF of jack & Bore, 3 complete fire hydrants, curb & gutter replacement, cut & cap ex. Waterline, etc., traffic control, erosion control, and other miscellaneous work.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis