Discover Opportunities months before the RFP drops
Learn more →Project scope shall include the construction of 10-foot inner diameter cast-in-place duplex lift station with valve vault, two (2) 388 gallon per minute submersible pumps, one (1) odor control, one (1) frp building, all associated pipe, valves and fittings, electronical controls, and site work
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Project scope shall include the construction of 10-foot inner diameter cast-in-place duplex lift station with valve vault, two (2) 388 gallon per minute submersible pumps, one (1) odor control, one (1) frp building, all associated pipe, valves and fittings, electronical controls, and site work
AvailableWork includes to construct water plant facilities, excluding water well that also includes clearing and grubbing, to be hauled off-site and disposed of properly; 1 EA 160,000 gal (nominal) bolted water storage tank, including all appurtenances and subsidiary items as specified including, but not limited to, materials, labor, supervision, equipment and coating system, complete and in place; 1 ls control building and foundation including all appurtenances and subsidiary items including, but not limited to, three (3 - 800 gpm booster pumps and three (3) 50 hp motors together with all piping and necessary fittings, conveyance system, chlorination system. See attached file.
Posted Date
-
Due Date
Oct 15, 2025
Close: Oct 15, 2025
Work includes to construct water plant facilities, excluding water well that also includes clearing and grubbing, to be hauled off-site and disposed of properly; 1 EA 160,000 gal (nominal) bolted water storage tank, including all appurtenances and subsidiary items as specified including, but not limited to, materials, labor, supervision, equipment and coating system, complete and in place; 1 ls control building and foundation including all appurtenances and subsidiary items including, but not limited to, three (3 - 800 gpm booster pumps and three (3) 50 hp motors together with all piping and necessary fittings, conveyance system, chlorination system. See attached file.
The work consist of approx 6,322 SY 6" concrete pavement; 6,695 SY 8" stabilized subgrade; 23 LF 5" concrete sidewalk' 1 EA street name sign with post; 33 LF standard pavement header.
Posted Date
Sep 2, 2025
Due Date
Dec 10, 2025
Release: Sep 2, 2025
Close: Dec 10, 2025
The work consist of approx 6,322 SY 6" concrete pavement; 6,695 SY 8" stabilized subgrade; 23 LF 5" concrete sidewalk' 1 EA street name sign with post; 33 LF standard pavement header.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis