Discover Opportunities months before the RFP drops
Learn more →The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
AvailableBuilding Construction including, but not limited to a new 10,000 +/- sq ft New Warehouse Building, to include all interior rooms and finish, mechanical, HVAC, electrical, and plumbing installations. Site Preparation including, but not limited to excavation and grading, sedimentation and erosion control, utilities, concrete side- walk(s), landscaping and permanent seeding, building sub-grade preparation, and all site utilities.
Posted Date
Oct 14, 2025
Due Date
Nov 18, 2025
Release: Oct 14, 2025
Close: Nov 18, 2025
Building Construction including, but not limited to a new 10,000 +/- sq ft New Warehouse Building, to include all interior rooms and finish, mechanical, HVAC, electrical, and plumbing installations. Site Preparation including, but not limited to excavation and grading, sedimentation and erosion control, utilities, concrete side- walk(s), landscaping and permanent seeding, building sub-grade preparation, and all site utilities.
Release: Oct 2, 2025
Close: Oct 28, 2025
Supply of 911 center console furniture.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis