Discover Opportunities months before the RFP drops
Learn more →Scope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Scope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
AvailableEngineering design, permitting, bidding, construction contract administration, testing, inspection and certification services for the zones 6 and 7 expansion.
Posted Date
Nov 20, 2025
Due Date
Dec 30, 2025
Release: Nov 20, 2025
Close: Dec 30, 2025
Engineering design, permitting, bidding, construction contract administration, testing, inspection and certification services for the zones 6 and 7 expansion.
AvailableScope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Scope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis