Discover Opportunities months before the RFP drops
Learn more →The work includes drilling, soil sampling, and groundwater sampling at five designated locations with potential contamination concerns. The contractor will provide all labor, equipment, materials, and support necessary to complete borings, install test wells, collect samples, and prepare the required report.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
The work includes drilling, soil sampling, and groundwater sampling at five designated locations with potential contamination concerns. The contractor will provide all labor, equipment, materials, and support necessary to complete borings, install test wells, collect samples, and prepare the required report.
AvailableProject includes concrete and CMU surface preparation, repointing, and painting as indicated in the plans and specifications; Replacing joint sealants as indicated in the plans and specifications; Surface preparation and painting for exterior doors and frames including overhead doors as indicated in the plans and specifications; Replacing downspouts and roof flashing as indicated. See outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Project includes concrete and CMU surface preparation, repointing, and painting as indicated in the plans and specifications; Replacing joint sealants as indicated in the plans and specifications; Surface preparation and painting for exterior doors and frames including overhead doors as indicated in the plans and specifications; Replacing downspouts and roof flashing as indicated. See outside link.
AvailableModernization of the overhead traction elevator in the chemical building at the water treatment plant. Work includes removing all existing elevator equipment except the main guide rails and counterweight rails, and installing: new elevator cab. New hoistway door equipment and tracks. New signal fixtures new landing systems. New hoistway and car wiring. All related building, mechanical, electrical, and life-safety upgrades needed to bring the system into compliance with current local codes.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Modernization of the overhead traction elevator in the chemical building at the water treatment plant. Work includes removing all existing elevator equipment except the main guide rails and counterweight rails, and installing: new elevator cab. New hoistway door equipment and tracks. New signal fixtures new landing systems. New hoistway and car wiring. All related building, mechanical, electrical, and life-safety upgrades needed to bring the system into compliance with current local codes.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis