Discover Opportunities months before the RFP drops
Learn more →Construction of a new landfill cell (Cell E) and other site improvements at the landfill. Cell construction includes: Excavation, hauling, and placement of on-site soils; processing on-site borrow soils; construction of recompacted clay liner, geomembrane liner, and drainage layer; geotextiles; granular soils; collection piping; construction of storm water conveyance and pollution prevention structures; fencing and gates; roadway construction and surfacing; leachate force main electrical; topsoiling, seeding and fertilizing; erosion controls. See attached file.
Posted Date
Nov 26, 2025
Due Date
Jan 28, 2026
Release: Nov 26, 2025
Close: Jan 28, 2026
Construction of a new landfill cell (Cell E) and other site improvements at the landfill. Cell construction includes: Excavation, hauling, and placement of on-site soils; processing on-site borrow soils; construction of recompacted clay liner, geomembrane liner, and drainage layer; geotextiles; granular soils; collection piping; construction of storm water conveyance and pollution prevention structures; fencing and gates; roadway construction and surfacing; leachate force main electrical; topsoiling, seeding and fertilizing; erosion controls. See attached file.
AvailableCell F construction project includes: bulk excavation, hauling, placement, compaction, and stockpiling of on-site soils; installation of groundwater control system; recompacted clay liner; HDPE geomembrane liner and rain cover; geotextiles; fine- and coarse-grained aggregate; perforated and solid PVC leachate collection piping; construction of storm water conveyance and pollution prevention structures; roadway surfacing; alternate asphalt paving; sediment removal from sediment ponds; sediment pond riser structure removal and replacement; and the work required.
Posted Date
Jan 31, 2025
Due Date
Feb 28, 2025
Release: Jan 31, 2025
Close: Feb 28, 2025
Cell F construction project includes: bulk excavation, hauling, placement, compaction, and stockpiling of on-site soils; installation of groundwater control system; recompacted clay liner; HDPE geomembrane liner and rain cover; geotextiles; fine- and coarse-grained aggregate; perforated and solid PVC leachate collection piping; construction of storm water conveyance and pollution prevention structures; roadway surfacing; alternate asphalt paving; sediment removal from sediment ponds; sediment pond riser structure removal and replacement; and the work required.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis