Learn more →Demo/Removal: a. Contractor shall perform Lock Out/Tag Out (LO/TO) procedures prior to starting any HVAC repair work that involves electrical circuits. Coordinate any required outages with Navy Lodge On-Site POC, Connie Butler, and keep the NEXCOM Project Manager (PM), Christopher Wahl, informed of the outage schedule(s) as applicable. b. Contractor shall disconnect power and any necessary refrigerant lines, electrical components, or ducting required to access and replace the failed parts within the HVAC unit. c. Contractor shall remove and properly dispose of any failed HVAC components. All disposals shall adhere to Section C, Codes and Regulations. d. Contractor shall be responsible for any repairs to wall finishes, flooring, ceilings, and entrances damaged as a result of the component removal and replacement. See attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Demo/Removal: a. Contractor shall perform Lock Out/Tag Out (LO/TO) procedures prior to starting any HVAC repair work that involves electrical circuits. Coordinate any required outages with Navy Lodge On-Site POC, Connie Butler, and keep the NEXCOM Project Manager (PM), Christopher Wahl, informed of the outage schedule(s) as applicable. b. Contractor shall disconnect power and any necessary refrigerant lines, electrical components, or ducting required to access and replace the failed parts within the HVAC unit. c. Contractor shall remove and properly dispose of any failed HVAC components. All disposals shall adhere to Section C, Codes and Regulations. d. Contractor shall be responsible for any repairs to wall finishes, flooring, ceilings, and entrances damaged as a result of the component removal and replacement. See attached file.
AvailableSeeks to identify labels that can be properly marked with fine tip marker. See Figures 1 – 4 as examples of labels. Any sewn in labels must be Berry amendment compliant. The labels must be capable of meeting the following technical requirements and shall be confirmed/reported when submitting: Requirements: 1. All labels must be able to withstand wash/dry laundering. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
Seeks to identify labels that can be properly marked with fine tip marker. See Figures 1 – 4 as examples of labels. Any sewn in labels must be Berry amendment compliant. The labels must be capable of meeting the following technical requirements and shall be confirmed/reported when submitting: Requirements: 1. All labels must be able to withstand wash/dry laundering. See attached file.
AvailableConduct a comprehensive assessment and diagnostic evaluation of the fire alarm system; and Perform ancillary troubleshooting and minor repairs, as authorized, during the course of the assessment to identify or correct system faults. The objective is to identify the underlying deficiencies and provide a clear path to fully restoring the system to operational status. Assessment and Investigation (Firm-Fixed-Price). Under the firm-fixed-price CLIN, the Contractor shall: Conduct a full system evaluation including panel diagnostics, device testing, wiring continuity checks, and signal verification. Identify non-functioning components and probable causes of system failure. See attached file.
Posted Date
Oct 21, 2025
Due Date
Oct 30, 2025
Release: Oct 21, 2025
Close: Oct 30, 2025
Conduct a comprehensive assessment and diagnostic evaluation of the fire alarm system; and Perform ancillary troubleshooting and minor repairs, as authorized, during the course of the assessment to identify or correct system faults. The objective is to identify the underlying deficiencies and provide a clear path to fully restoring the system to operational status. Assessment and Investigation (Firm-Fixed-Price). Under the firm-fixed-price CLIN, the Contractor shall: Conduct a full system evaluation including panel diagnostics, device testing, wiring continuity checks, and signal verification. Identify non-functioning components and probable causes of system failure. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis