Discover Opportunities months before the RFP drops
Learn more →Supply and install a poly body with an integrated 2,000-gallon water tank on a fire apparatus chassis. A fill tower / overflow will be installed on the top of the tank on the left side, centered front to rear. The overflow pipe will be 6.0” diameter and will discharge at the center rear of the tank by the rear axles when the tank is installed. The tank will have enhanced side walls to 0.75” thickness for additional durability. The visible side walls will be a polished smooth finish for future painting. Tank will include a hose bed on top of the tank No hose bed dividers are planned at this time.
Posted Date
-
Due Date
Dec 22, 2025
Release: -
Close: Dec 22, 2025
Supply and install a poly body with an integrated 2,000-gallon water tank on a fire apparatus chassis. A fill tower / overflow will be installed on the top of the tank on the left side, centered front to rear. The overflow pipe will be 6.0” diameter and will discharge at the center rear of the tank by the rear axles when the tank is installed. The tank will have enhanced side walls to 0.75” thickness for additional durability. The visible side walls will be a polished smooth finish for future painting. Tank will include a hose bed on top of the tank No hose bed dividers are planned at this time.
AvailableClose: Dec 22, 2025
Wildland Fire / Brush Truck.
AvailableModifications to 2014 Kenworth tender to enable pump and roll. (Mechanical and computer work required).
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Modifications to 2014 Kenworth tender to enable pump and roll. (Mechanical and computer work required).
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis