Discover Opportunities months before the RFP drops
Learn more →The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis