Discover Opportunities months before the RFP drops
Learn more →Work includes water services two (2") in dia. and smaller in public and private space; curb stop / curb stop box; meter box; valves and appurtenances; penetration through building wall and connection to first fitting inside the building including installation of a shut-off valve and pressure reducing valve; permanent pavement and surface restoration.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Work includes water services two (2") in dia. and smaller in public and private space; curb stop / curb stop box; meter box; valves and appurtenances; penetration through building wall and connection to first fitting inside the building including installation of a shut-off valve and pressure reducing valve; permanent pavement and surface restoration.
AvailableIndustrial High Pressure and Vacuum Truck Services to structures and equipment located at Waste Water Treatment Plant facility. This scope of work details the requirements to provide a detailed technical and safety proposal for equipment and personnel necessary to perform high vacuum high pressure cleaning services. Provide a detailed description of their responsibility for safe inspecting, cleaning and removing sediment, scum, waste debris, and other materials from drains, channels, stormwater runoff pump stations & catch basins, sump pumps, centrifuges, conveyance systems, process tanks, storage tanks, and piping throughout the District of Columbia Advanced Wastewater Treatment Plant.
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
Industrial High Pressure and Vacuum Truck Services to structures and equipment located at Waste Water Treatment Plant facility. This scope of work details the requirements to provide a detailed technical and safety proposal for equipment and personnel necessary to perform high vacuum high pressure cleaning services. Provide a detailed description of their responsibility for safe inspecting, cleaning and removing sediment, scum, waste debris, and other materials from drains, channels, stormwater runoff pump stations & catch basins, sump pumps, centrifuges, conveyance systems, process tanks, storage tanks, and piping throughout the District of Columbia Advanced Wastewater Treatment Plant.
AvailableQualification phase for suitable suppliers for the rehabilitation of DC water's historic main pump station outside of DC water's hqo location.
Posted Date
Nov 4, 2025
Due Date
Dec 15, 2025
Release: Nov 4, 2025
Close: Dec 15, 2025
Qualification phase for suitable suppliers for the rehabilitation of DC water's historic main pump station outside of DC water's hqo location.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis