Discover Opportunities months before the RFP drops
Learn more →Project includes 28,102 SQ YD Remove Bituminous pavement, 62,407 CU YD Excavation-common. 30,105 CU YD Select granular embankment (CV).
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Project includes 28,102 SQ YD Remove Bituminous pavement, 62,407 CU YD Excavation-common. 30,105 CU YD Select granular embankment (CV).
AvailableProvide labor and material services generally described as: automatic gate operator and associated control components maintenance, repair, and installation.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
Provide labor and material services generally described as: automatic gate operator and associated control components maintenance, repair, and installation.
AvailableSingle-prime contractor required to perform window replacement for Whitetail Woods camper cabins (Farmington, MN). Scope includes removal and installation of cabin windows; estimated construction cost $200,000. Procurement requires prevailing wages, county bid form submission, 5% bid security, and 100% performance and payment bonds. Substantial Completion required by June 30, 2026.
Posted Date
Nov 27, 2025
Due Date
Dec 18, 2025
Release: Nov 27, 2025
Close: Dec 18, 2025
Single-prime contractor required to perform window replacement for Whitetail Woods camper cabins (Farmington, MN). Scope includes removal and installation of cabin windows; estimated construction cost $200,000. Procurement requires prevailing wages, county bid form submission, 5% bid security, and 100% performance and payment bonds. Substantial Completion required by June 30, 2026.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis