Discover Opportunities months before the RFP drops
Learn more →Project includes interior office upgrades, MEP infrastructure upgrades, bathroom renovations and the installation of a concrete ramp at main entrance to achieve ADA accessibility.
Posted Date
Nov 13, 2025
Due Date
Dec 4, 2025
Release: Nov 13, 2025
Close: Dec 4, 2025
Project includes interior office upgrades, MEP infrastructure upgrades, bathroom renovations and the installation of a concrete ramp at main entrance to achieve ADA accessibility.
Work includes includes, but not limited to structural concrete, masonry, structural steel, roofing, glass and glazing, athletic flooring, resilient flooring, drywall and framing, ceilings, tiling, painting, general trades (specialties, door/frame/hw, millwork, high pressure laminate), athletic equipment, plumbing, mechanical, electrical (including lv and fire alarm), excavation and site demolition, site utilities, site concrete, asphalt. BP 1 Demolition and Earthwork, BP 2 Site Utilities, BP 3 Building and Site Concrete, BP 4 Masonry, BP 5 Structural Steel and Misc. Metals, BP 6 Asphalt Paving and Parking Accessories, BP 7 Landscaping, BP 8 Metal Panels, BP 9 Roofing, BP 10 Athletic Equipment, BP 11 General Trades, BP 12 Athletic Flooring, BP 13 Painting, BP 14 Flooring and Tile, BP 15 Fire Protection, BP 16 Plumbing, BP 17 Mechanical, BP 18 Electrical LV and AV.
Posted Date
Oct 10, 2025
Due Date
Nov 7, 2025
Release: Oct 10, 2025
Close: Nov 7, 2025
Work includes includes, but not limited to structural concrete, masonry, structural steel, roofing, glass and glazing, athletic flooring, resilient flooring, drywall and framing, ceilings, tiling, painting, general trades (specialties, door/frame/hw, millwork, high pressure laminate), athletic equipment, plumbing, mechanical, electrical (including lv and fire alarm), excavation and site demolition, site utilities, site concrete, asphalt. BP 1 Demolition and Earthwork, BP 2 Site Utilities, BP 3 Building and Site Concrete, BP 4 Masonry, BP 5 Structural Steel and Misc. Metals, BP 6 Asphalt Paving and Parking Accessories, BP 7 Landscaping, BP 8 Metal Panels, BP 9 Roofing, BP 10 Athletic Equipment, BP 11 General Trades, BP 12 Athletic Flooring, BP 13 Painting, BP 14 Flooring and Tile, BP 15 Fire Protection, BP 16 Plumbing, BP 17 Mechanical, BP 18 Electrical LV and AV.
Release: Aug 29, 2025
Close: Sep 25, 2025
ABS Band Uniforms.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis