Discover Opportunities months before the RFP drops
Learn more →Construction manager at risk for medical complex. The health center is a single-story building with an estimated gross floor area of approx. 12,000 sf, which will provide integrated healthcare services, combining general medical clinic functions with urgent care capabilities. The medical complex will be a brand-new facility that consists of six exam rooms, six treatment rooms, a procedure room, a radiography/ultrasound suite, a CT scanner room, a STAT laboratory and blood draw area, a full retail pharmacy with a drive-through window.
Posted Date
Nov 13, 2025
Due Date
Dec 4, 2025
Release: Nov 13, 2025
Close: Dec 4, 2025
Construction manager at risk for medical complex. The health center is a single-story building with an estimated gross floor area of approx. 12,000 sf, which will provide integrated healthcare services, combining general medical clinic functions with urgent care capabilities. The medical complex will be a brand-new facility that consists of six exam rooms, six treatment rooms, a procedure room, a radiography/ultrasound suite, a CT scanner room, a STAT laboratory and blood draw area, a full retail pharmacy with a drive-through window.
This project consists of a new hospital built in the location of a previously demolished hospital. The building will consist of triage, scanning, laboratory space, therapy/treatment spaces, overnight rooms, staff areas, and operations spaces. The new building is attached to an existing clinic. A complete civil package is included with low maintenance items such as concrete paving and low maintenance landscaping. The bid packages include the following: bid package 03.A - concrete; bid package 04.A - masonry; bid package 05.Aa - structural steel supply; bid package 05.Ab - structural steel erection; bid package 06.D - architectural woodwork; bid package 07.D - EIFS; bid package 07.E - metal wall panels; bid package 07.F - roofing; bid package 07.J - sealants and waterproofing; bid package 08. A - doors, frames, and hardware supply; bid package 08.D - overhead doors; bid package 08.F - automatic entrances, storefronts, and glazing; bid package 09.A - drywall and ceilings; bid package 09.B - flooring and tile; bid package 09.H - painting; bid package 10.C - signage; bid package 10.D - specialties supply; bid package 10.G - healthcare specialties supply; bid package 12.C - window treatments; bid package 21.A - fire suppression; bid package 22.A - plumbing; bid package 23.A - HVAC; bid package 26.A - electrical; bid package 31.A - site work; bid package 32.A - paving; bid package 32.F - landscaping; bid package 32.G - fencing; bid package 32.H - site furniture; bid package 33.A - utilities; bid package 80.A - general trades.
Posted Date
Oct 17, 2025
Due Date
Nov 11, 2025
Release: Oct 17, 2025
Close: Nov 11, 2025
This project consists of a new hospital built in the location of a previously demolished hospital. The building will consist of triage, scanning, laboratory space, therapy/treatment spaces, overnight rooms, staff areas, and operations spaces. The new building is attached to an existing clinic. A complete civil package is included with low maintenance items such as concrete paving and low maintenance landscaping. The bid packages include the following: bid package 03.A - concrete; bid package 04.A - masonry; bid package 05.Aa - structural steel supply; bid package 05.Ab - structural steel erection; bid package 06.D - architectural woodwork; bid package 07.D - EIFS; bid package 07.E - metal wall panels; bid package 07.F - roofing; bid package 07.J - sealants and waterproofing; bid package 08. A - doors, frames, and hardware supply; bid package 08.D - overhead doors; bid package 08.F - automatic entrances, storefronts, and glazing; bid package 09.A - drywall and ceilings; bid package 09.B - flooring and tile; bid package 09.H - painting; bid package 10.C - signage; bid package 10.D - specialties supply; bid package 10.G - healthcare specialties supply; bid package 12.C - window treatments; bid package 21.A - fire suppression; bid package 22.A - plumbing; bid package 23.A - HVAC; bid package 26.A - electrical; bid package 31.A - site work; bid package 32.A - paving; bid package 32.F - landscaping; bid package 32.G - fencing; bid package 32.H - site furniture; bid package 33.A - utilities; bid package 80.A - general trades.
This project is phase 1 of a new hybrid operating room.
Posted Date
Apr 10, 2025
Due Date
May 1, 2025
Release: Apr 10, 2025
Close: May 1, 2025
This project is phase 1 of a new hybrid operating room.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis