Discover Opportunities months before the RFP drops
Learn more →Columbus State Community College seeks qualifications from professional service firms for new construction and renovation projects in 2026. Disciplines include architecture, engineering, and special consultancy. Firms must reapply to maintain pre-qualification status.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Close: Dec 11, 2025
Columbus State Community College seeks qualifications from professional service firms for new construction and renovation projects in 2026. Disciplines include architecture, engineering, and special consultancy. Firms must reapply to maintain pre-qualification status.
Provide hall roof replacement. Items included in the building roof replacement but are not limited to: roof: complete replacement of the bur roof to a sbs modified bitumen roof system with fully adhered polyisocyanurate insulation (r-30), recovery boards, fully adhered base sheet and torch down sbs cap sheet. Roof parapets: coping metals with kynar finish basis of design must be installed on the parapets, with reglet type base fastened over new fire treated wood blocking. Exterior roof systems: surface corrosion at wind girts, beams, and grating. See attached file.
Posted Date
Oct 20, 2025
Due Date
Nov 14, 2025
Release: Oct 20, 2025
Close: Nov 14, 2025
Provide hall roof replacement. Items included in the building roof replacement but are not limited to: roof: complete replacement of the bur roof to a sbs modified bitumen roof system with fully adhered polyisocyanurate insulation (r-30), recovery boards, fully adhered base sheet and torch down sbs cap sheet. Roof parapets: coping metals with kynar finish basis of design must be installed on the parapets, with reglet type base fastened over new fire treated wood blocking. Exterior roof systems: surface corrosion at wind girts, beams, and grating. See attached file.
Columbus State Community College seeks design-build services for replacing hot water gas-fired boilers at Union Hall. The project involves demolition of existing boilers and ancillary equipment, installation of new equipment, and related facility improvements. The estimated construction cost is $925,000, with a total project cost of $1,025,000. The project requires coordination to maintain building operations during construction.
Posted Date
-
Due Date
Nov 1, 2024
Release: -
Close: Nov 1, 2024
Columbus State Community College seeks design-build services for replacing hot water gas-fired boilers at Union Hall. The project involves demolition of existing boilers and ancillary equipment, installation of new equipment, and related facility improvements. The estimated construction cost is $925,000, with a total project cost of $1,025,000. The project requires coordination to maintain building operations during construction.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis