Discover Opportunities months before the RFP drops
Learn more →Procurement of firms to conduct a Bathymetric Survey of the City's waterways using Lidar or Echo Sounding technologies, including aquatic vegetation clearing, traffic maintenance, sediment control, and site restoration.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Close: Dec 11, 2025
Procurement of firms to conduct a Bathymetric Survey of the City's waterways using Lidar or Echo Sounding technologies, including aquatic vegetation clearing, traffic maintenance, sediment control, and site restoration.
Request for Qualifications for Construction Engineering & Inspection (CEI) Services for the construction of additional bicycle lanes to Bonaventure Boulevard from Indian Trace north to SR 84, including widening, milling, resurfacing, striping, and signing.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Request for Qualifications for Construction Engineering & Inspection (CEI) Services for the construction of additional bicycle lanes to Bonaventure Boulevard from Indian Trace north to SR 84, including widening, milling, resurfacing, striping, and signing.
AvailableThe City of Weston seeks qualifications from firms to provide Construction Engineering & Inspection (CEI) services for the Bonaventure Boulevard Bicycle Lanes project from Indian Trace to SR-84. The LAP project, with FDOT oversight and partial federal funding, includes widening, milling, resurfacing, striping, signing, and adding 5–7 foot bike lanes on both sides of Bonaventure Boulevard. A non-mandatory virtual pre-proposal conference is scheduled for December 16, 2025, and proposals are due January 6, 2026 at 2:00 PM Eastern.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
The City of Weston seeks qualifications from firms to provide Construction Engineering & Inspection (CEI) services for the Bonaventure Boulevard Bicycle Lanes project from Indian Trace to SR-84. The LAP project, with FDOT oversight and partial federal funding, includes widening, milling, resurfacing, striping, signing, and adding 5–7 foot bike lanes on both sides of Bonaventure Boulevard. A non-mandatory virtual pre-proposal conference is scheduled for December 16, 2025, and proposals are due January 6, 2026 at 2:00 PM Eastern.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis