Discover Opportunities months before the RFP drops
Learn more →Scope of this project consists primarily of installing emergency generators, including supporting infrastructure, at existing sanitary sewer lift stations.
Posted Date
Aug 13, 2025
Due Date
Jan 6, 2026
Release: Aug 13, 2025
Close: Jan 6, 2026
Scope of this project consists primarily of installing emergency generators, including supporting infrastructure, at existing sanitary sewer lift stations.
AvailableProvide health insurance service includes fully insured and level funded group medical, fully insured dental, vision, short term disability, long term disability, basic life, voluntary life, critical illness, accident, hospital indemnity, whole/universal life, EAP.
Posted Date
May 14, 2025
Due Date
Jun 6, 2025
Release: May 14, 2025
Close: Jun 6, 2025
Provide health insurance service includes fully insured and level funded group medical, fully insured dental, vision, short term disability, long term disability, basic life, voluntary life, critical illness, accident, hospital indemnity, whole/universal life, EAP.
Work consist of 130 LF of removing curb (concrete), removal and disposal of concrete slab including saw cutting, demo and salvage structure canopy, undercutting to construct new foundations and slabs. Includes all site excavation and backfill to subgrade foundation preparation, construction of new structure foundations. Includes all base stone, forming, reinforcement, providing installing galvanized structure anchor bolts, concrete placement, finishing, and protection, construction of reinforced concrete apron slab, including expansion, construction joints and sealants. See attached file.
Posted Date
-
Due Date
Apr 23, 2025
Release: -
Close: Apr 23, 2025
Work consist of 130 LF of removing curb (concrete), removal and disposal of concrete slab including saw cutting, demo and salvage structure canopy, undercutting to construct new foundations and slabs. Includes all site excavation and backfill to subgrade foundation preparation, construction of new structure foundations. Includes all base stone, forming, reinforcement, providing installing galvanized structure anchor bolts, concrete placement, finishing, and protection, construction of reinforced concrete apron slab, including expansion, construction joints and sealants. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis