Discover Opportunities months before the RFP drops
Learn more →Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
AvailableThis Bid Informational Summary is for an enclosed landfill gas (LFG) ground flare station to incinerate LFG at a closed municipal solid waste facility located at 3100 Vichy Springs Road in Ukiah, California.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
This Bid Informational Summary is for an enclosed landfill gas (LFG) ground flare station to incinerate LFG at a closed municipal solid waste facility located at 3100 Vichy Springs Road in Ukiah, California.
AvailableProject consists of draining and storing the transformer oil and inspecting the interior of transformer tr-2. See outside link.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Project consists of draining and storing the transformer oil and inspecting the interior of transformer tr-2. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis