Discover Opportunities months before the RFP drops
Learn more →Site construction of a sanitary (trash) compactor facility.
Posted Date
Nov 25, 2025
Due Date
Jan 5, 2026
Release: Nov 25, 2025
Close: Jan 5, 2026
Site construction of a sanitary (trash) compactor facility.
AvailableWork includes 39 EA construct and remove inlet sediment trap; 3,392 LF maintenance of temporary silt fence, tp a; 3,392 LF temporary silt fence, type a; 137 TN recycled asph conc leveling, incl bitum matl & h lime; 629 TN recycled asph conc 25 mm superpave, gp 1 or 2, incl bitum matl & h lime; 836 TN recycled asph conc 12.5 mm superpave,gp 2 only, incl polymer-modified bitum matl & h lime; 1,093 SY conc sidewalk, 4"; 497 SY conc sidewalk, 8"; 320 SY conc valley gutter, 6"; 107 LF concrete header curb, 4", tp 1; 370 LF conc curb & gutter, 8" x 30", tp 9; 1,608 LF pvmt reinf fabric strips, tp 2, 18" width; 1,021 LF storm drain pipe, 18", class iii. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Work includes 39 EA construct and remove inlet sediment trap; 3,392 LF maintenance of temporary silt fence, tp a; 3,392 LF temporary silt fence, type a; 137 TN recycled asph conc leveling, incl bitum matl & h lime; 629 TN recycled asph conc 25 mm superpave, gp 1 or 2, incl bitum matl & h lime; 836 TN recycled asph conc 12.5 mm superpave,gp 2 only, incl polymer-modified bitum matl & h lime; 1,093 SY conc sidewalk, 4"; 497 SY conc sidewalk, 8"; 320 SY conc valley gutter, 6"; 107 LF concrete header curb, 4", tp 1; 370 LF conc curb & gutter, 8" x 30", tp 9; 1,608 LF pvmt reinf fabric strips, tp 2, 18" width; 1,021 LF storm drain pipe, 18", class iii. See attached files.
AvailableReplacement of failed culverts and associated catch basin structures and headwalls at four (4) locations. The work required under this contract includes furnishing materials, qualified labor, equipment, traffic control, erosion control, and site restoration at each location as described in the accompanying construction plans. Abandon the existing system in place and remove existing catch basin structure top to a point of existing shoulder grade. Install a 30” RCP culvert. Approximately 120 linear feet of 30” diameter RCP pipe. Pavement repair of road and multi-use trail to match existing pavement cross section.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Close: Dec 4, 2025
Replacement of failed culverts and associated catch basin structures and headwalls at four (4) locations. The work required under this contract includes furnishing materials, qualified labor, equipment, traffic control, erosion control, and site restoration at each location as described in the accompanying construction plans. Abandon the existing system in place and remove existing catch basin structure top to a point of existing shoulder grade. Install a 30” RCP culvert. Approximately 120 linear feet of 30” diameter RCP pipe. Pavement repair of road and multi-use trail to match existing pavement cross section.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis