Discover Opportunities months before the RFP drops
Learn more →Seeks to implement an Advanced Metering Infrastructure (AMI) system. The AMI system will provide reliable data collection, outage management, leak detection, and integration with the City’s Tyler Technologies/Sensus Encode billing software.
Posted Date
-
Due Date
Jan 9, 2026
Close: Jan 9, 2026
Seeks to implement an Advanced Metering Infrastructure (AMI) system. The AMI system will provide reliable data collection, outage management, leak detection, and integration with the City’s Tyler Technologies/Sensus Encode billing software.
AvailableConstruction of approximately 728 feet of a road section consisting of 24-foot wide 7” thick PCC pavement with no curb and gutter and with 3-foot wide granular shoulders on both sides of the pavement, installation of 380 linear feet of storm sewer with two (2) area intakes and a flared end section, and final seeding.
Posted Date
May 20, 2025
Due Date
Jun 12, 2025
Release: May 20, 2025
Close: Jun 12, 2025
Construction of approximately 728 feet of a road section consisting of 24-foot wide 7” thick PCC pavement with no curb and gutter and with 3-foot wide granular shoulders on both sides of the pavement, installation of 380 linear feet of storm sewer with two (2) area intakes and a flared end section, and final seeding.
This project will involve but not limited to: unway 11-29 1. Contractor qc testing 2. Installation and removal of silt fence 3. Temporary seeding and mulching 4. Mobilization 5. Traffic control 6. Construction staking 7. Pavement removal 8. Runway joint cleaning & sealing (as directed by rpr) 9. Runway crack route & seal (as directed by rpr) 10. Unclassified excavation 11. Cement treated subgrade, 12-inch 12. Cement 13. Modified subbase, 10-inch, iowa dot 4123 14. Engineering fabric, triaxial geogrid. See attached file for full scope.
Posted Date
Feb 26, 2025
Due Date
Mar 20, 2025
Release: Feb 26, 2025
Close: Mar 20, 2025
This project will involve but not limited to: unway 11-29 1. Contractor qc testing 2. Installation and removal of silt fence 3. Temporary seeding and mulching 4. Mobilization 5. Traffic control 6. Construction staking 7. Pavement removal 8. Runway joint cleaning & sealing (as directed by rpr) 9. Runway crack route & seal (as directed by rpr) 10. Unclassified excavation 11. Cement treated subgrade, 12-inch 12. Cement 13. Modified subbase, 10-inch, iowa dot 4123 14. Engineering fabric, triaxial geogrid. See attached file for full scope.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis