Discover Opportunities months before the RFP drops
Learn more →Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableWork consists of paving city streets with Class C asphalt and placing tack coat between asphalt layers. The Project consists of supplying and placing compacted asphalt and CSS-1 emulsion tack coat for street projects.
Posted Date
Jul 1, 2025
Due Date
Jul 14, 2025
Release: Jul 1, 2025
Close: Jul 14, 2025
Work consists of paving city streets with Class C asphalt and placing tack coat between asphalt layers. The Project consists of supplying and placing compacted asphalt and CSS-1 emulsion tack coat for street projects.
Perform approx 2,000 sf filter fabric at a depth of 11" below grade followed by 7.5" of gravel compacted to 95%, followed by poured in place rubber 3.5" thick, and install new piece of playground equipment (provided by city).
Posted Date
May 15, 2025
Due Date
May 27, 2025
Release: May 15, 2025
Close: May 27, 2025
Perform approx 2,000 sf filter fabric at a depth of 11" below grade followed by 7.5" of gravel compacted to 95%, followed by poured in place rubber 3.5" thick, and install new piece of playground equipment (provided by city).
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis