Discover Opportunities months before the RFP drops
Learn more →Design-build. Design and construction for occupancy by the community services consortium includes: convert an unfinished section of the building into an ada-compliant office and service space with restrooms, kitchenette, and hvac; installation of a single ada-compliant bathroom; installation of break room kitchen area to include cabinets, counter, sink, and electrical outlets for appliances (no dishwasher or stove), and necessary plumbing connections; installation of ceiling tiles; installation of additional hvac (mini-splits allowable); replacement of at least one window to ensure egress in compliance with commercial code; construction of a solid wall to remove access to the existing council chambers. See attached file.
Posted Date
Nov 14, 2025
Due Date
Feb 26, 2026
Release: Nov 14, 2025
Close: Feb 26, 2026
Design-build. Design and construction for occupancy by the community services consortium includes: convert an unfinished section of the building into an ada-compliant office and service space with restrooms, kitchenette, and hvac; installation of a single ada-compliant bathroom; installation of break room kitchen area to include cabinets, counter, sink, and electrical outlets for appliances (no dishwasher or stove), and necessary plumbing connections; installation of ceiling tiles; installation of additional hvac (mini-splits allowable); replacement of at least one window to ensure egress in compliance with commercial code; construction of a solid wall to remove access to the existing council chambers. See attached file.
AvailableThe proposed project includes a 600 ft sidewalk connecting the upper and lower parking lots, approx 855 ft of hard surfaced trails and 720 ft of soft surface trails to connect upper and lower and extension of an existing trail to provide water access, along with additional lighting, security cameras, park benches, amphitheater seating, and vegetation removal.
Posted Date
Sep 23, 2025
Due Date
Nov 13, 2025
Release: Sep 23, 2025
Close: Nov 13, 2025
The proposed project includes a 600 ft sidewalk connecting the upper and lower parking lots, approx 855 ft of hard surfaced trails and 720 ft of soft surface trails to connect upper and lower and extension of an existing trail to provide water access, along with additional lighting, security cameras, park benches, amphitheater seating, and vegetation removal.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis