Discover Opportunities months before the RFP drops
Learn more →Complete demolition and removal of the approximately 57,000-square-foot, three-story commercial structure. The building consists of multiple connected sections constructed between 1928 and 1990, with both concrete and steel structural components.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Complete demolition and removal of the approximately 57,000-square-foot, three-story commercial structure. The building consists of multiple connected sections constructed between 1928 and 1990, with both concrete and steel structural components.
AvailableGeneral construction includes lift station replacements at feltz and 10/51 lift stations, including site work, roadway restoration, yard piping, structural, process piping and equipment, electrical, instrumentation and control and demolition of the existing lift station.
Posted Date
Sep 29, 2025
Due Date
Oct 30, 2025
Release: Sep 29, 2025
Close: Oct 30, 2025
General construction includes lift station replacements at feltz and 10/51 lift stations, including site work, roadway restoration, yard piping, structural, process piping and equipment, electrical, instrumentation and control and demolition of the existing lift station.
CONTRACT "A" - GENERAL SITE CONSTRUCTION - Base Bid 1.Shared use path project with work including, but not limited to, demolition, clearing and grubbing, common excavation, erosion control, modular block retaining wall, boardwalk, bridge over the Plover River, dense graded base, asphalt paving, concrete curb and gutter, and landscape restoration. 2.All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid.
Posted Date
Aug 14, 2025
Due Date
Sep 16, 2025
Release: Aug 14, 2025
Close: Sep 16, 2025
CONTRACT "A" - GENERAL SITE CONSTRUCTION - Base Bid 1.Shared use path project with work including, but not limited to, demolition, clearing and grubbing, common excavation, erosion control, modular block retaining wall, boardwalk, bridge over the Plover River, dense graded base, asphalt paving, concrete curb and gutter, and landscape restoration. 2.All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis