Discover Opportunities months before the RFP drops
Learn more →Rehabilitation of historic house, livery and site for new city programming.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Close: Jan 19, 2026
Rehabilitation of historic house, livery and site for new city programming.
AvailableProject includes approx 3,067 CY of excavation; 2,686 CY of hauling excavated material offsite; 1,618 TON of Riprap Classs II (Fieldstone); 448 TON Riprap Classs III (Fieldstone); 38 TON of 1" - 3" Fieldstone (For Rock Riffles); 3.5 AC of Seeding; 700 LF of Wood Chip Trail; 3.5 AC Site Clearing/Selective Tree Harvest.
Posted Date
Sep 10, 2025
Due Date
Sep 24, 2025
Release: Sep 10, 2025
Close: Sep 24, 2025
Project includes approx 3,067 CY of excavation; 2,686 CY of hauling excavated material offsite; 1,618 TON of Riprap Classs II (Fieldstone); 448 TON Riprap Classs III (Fieldstone); 38 TON of 1" - 3" Fieldstone (For Rock Riffles); 3.5 AC of Seeding; 700 LF of Wood Chip Trail; 3.5 AC Site Clearing/Selective Tree Harvest.
Project coordination & work plan review existing phase i esa and boring logs, develop sampling plan, coordinate access. 2. Field investigation drilling and sampling, including virgin and filled areas; groundwater sampling as applicable. 3. Laboratory analysis vocs, svocs, metals, tph, pahs, pfas, pcbs and dros and other necessary tests using minnesota-certified lab. 4. Data evaluation & reporting compare results to mpca cleanup criteria; maps, findings, recommendations. 5. Deliverables draft and final phase ii esa report (pdf + 3 hard copies), lab reports, boring logs and remediation plan if required based on findings.
Posted Date
Aug 20, 2025
Due Date
Sep 3, 2025
Release: Aug 20, 2025
Close: Sep 3, 2025
Project coordination & work plan review existing phase i esa and boring logs, develop sampling plan, coordinate access. 2. Field investigation drilling and sampling, including virgin and filled areas; groundwater sampling as applicable. 3. Laboratory analysis vocs, svocs, metals, tph, pahs, pfas, pcbs and dros and other necessary tests using minnesota-certified lab. 4. Data evaluation & reporting compare results to mpca cleanup criteria; maps, findings, recommendations. 5. Deliverables draft and final phase ii esa report (pdf + 3 hard copies), lab reports, boring logs and remediation plan if required based on findings.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis