Discover Opportunities months before the RFP drops
Learn more →Proposals for activities to be funded in the Community Development Block Grant (CDBG) Program for Program Year 2026.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Proposals for activities to be funded in the Community Development Block Grant (CDBG) Program for Program Year 2026.
AvailableProvide 550 dry tons of liquid aluminum sulfate; 550 tons of liquid low-pressure carbon dioxide; 15,000 gallons of 23-25% fluoride; 40,000 lbs. Of sodium tripolyphosphate; 2,300 tons of quick lime (calcium oxide); 20,000 lbs. Anhydrous ammonia; 50 tons of liquid chlorine; 1,500,000 cubic feet; 25,000 gallons of liquid magnesium chloride; 600,000 lbs of liquid potassium hydroxide; 300,000 lbs of liquid sodium hydroxide; 300,000 lbs liquid sulfuric acid; 300,000 lbs of liquid sodium hypochlorite; 20,000 gallons of nitrate-based corrosion control chemical.
Posted Date
Oct 15, 2025
Due Date
Nov 19, 2025
Release: Oct 15, 2025
Close: Nov 19, 2025
Provide 550 dry tons of liquid aluminum sulfate; 550 tons of liquid low-pressure carbon dioxide; 15,000 gallons of 23-25% fluoride; 40,000 lbs. Of sodium tripolyphosphate; 2,300 tons of quick lime (calcium oxide); 20,000 lbs. Anhydrous ammonia; 50 tons of liquid chlorine; 1,500,000 cubic feet; 25,000 gallons of liquid magnesium chloride; 600,000 lbs of liquid potassium hydroxide; 300,000 lbs of liquid sodium hydroxide; 300,000 lbs liquid sulfuric acid; 300,000 lbs of liquid sodium hypochlorite; 20,000 gallons of nitrate-based corrosion control chemical.
Approx. 380 LF sawing bituminous pavement (full depth), 140 CY common excavation, 80 CY aggregate base, 90 tons bituminous paving, 10,000 SF 6" concrete walk, 3,250 SF 8" concrete walk, 1 lump sum traffic control, and 200 CY common top soil borrow, together with appurtenant work and general restoration.
Posted Date
Jul 8, 2025
Due Date
Jul 30, 2025
Release: Jul 8, 2025
Close: Jul 30, 2025
Approx. 380 LF sawing bituminous pavement (full depth), 140 CY common excavation, 80 CY aggregate base, 90 tons bituminous paving, 10,000 SF 6" concrete walk, 3,250 SF 8" concrete walk, 1 lump sum traffic control, and 200 CY common top soil borrow, together with appurtenant work and general restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium