Discover Opportunities months before the RFP drops
Learn more →Provide water treatment chemicals includes chlorine, liquid aluminum sulfate, liquid sodium chlorite 25% solution, liquid caustic soda (sodium hydroxide) 50% solution.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Close: Dec 11, 2025
Provide water treatment chemicals includes chlorine, liquid aluminum sulfate, liquid sodium chlorite 25% solution, liquid caustic soda (sodium hydroxide) 50% solution.
Work includes approx 215 SY removed and replace sidewalk/median; 3 EA manhole cover adjustment; 14,000 SF surface cleaning, preparation and painting; 2,509 LF 4" solid white pavement marking. 128 SY full depth pavement patch - concrete; 59 SY full depth pavement patch - asphalt; 152 LF remove & replace curb & gutter; 12 SF concrete patching, underneath bridge; 80 SF concrete patching, railing repair; 1 ea valve cover adjustment; 14,000 SF surface cleaning, preparation and painting; 19 LF pavement markings, 12" solid white (stop bar); 1332 LF pavement marking, 4" solid yellow; 2509 LF pavement marking, 4" solid white; 20 LF pavement marking, 4" dashed white; 5 EA pavement marking, right turn only & arrow; 36 SF aluminum panel traffic signs. See attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Close: Dec 4, 2025
Work includes approx 215 SY removed and replace sidewalk/median; 3 EA manhole cover adjustment; 14,000 SF surface cleaning, preparation and painting; 2,509 LF 4" solid white pavement marking. 128 SY full depth pavement patch - concrete; 59 SY full depth pavement patch - asphalt; 152 LF remove & replace curb & gutter; 12 SF concrete patching, underneath bridge; 80 SF concrete patching, railing repair; 1 ea valve cover adjustment; 14,000 SF surface cleaning, preparation and painting; 19 LF pavement markings, 12" solid white (stop bar); 1332 LF pavement marking, 4" solid yellow; 2509 LF pavement marking, 4" solid white; 20 LF pavement marking, 4" dashed white; 5 EA pavement marking, right turn only & arrow; 36 SF aluminum panel traffic signs. See attached file.
Demolition and removal of two existing bridges, grading and construction of temporary detours, regrading of the drainage channels in preparation for new structures, installation of an aluminum box culvert for bridge 1 to the north with aluminum headwalls and wingwalls, installation of a 66" CMP culvert for bridge 2 to the south with concrete headwalls, roadway paving for bridge 2, base course roadway for bridge 1, and NMDOT guardrails and terminations for both bridges.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
Close: Nov 20, 2025
Demolition and removal of two existing bridges, grading and construction of temporary detours, regrading of the drainage channels in preparation for new structures, installation of an aluminum box culvert for bridge 1 to the north with aluminum headwalls and wingwalls, installation of a 66" CMP culvert for bridge 2 to the south with concrete headwalls, roadway paving for bridge 2, base course roadway for bridge 1, and NMDOT guardrails and terminations for both bridges.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis