Discover Opportunities months before the RFP drops
Learn more →Water Treatment Chemicals.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Water Treatment Chemicals.
AvailableThe work consist of approx 1 LS remove, inspect, and reinstall vertical turbine line shaft pump and electric motor; 1 LS 12" line shaft column couplings; 1 LS bearing retainer with rubber bearing; 1 LS furnish stainless steel head shaft; 1 LS re-assemble bowl assembly. See outside link.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
Close: Nov 25, 2025
The work consist of approx 1 LS remove, inspect, and reinstall vertical turbine line shaft pump and electric motor; 1 LS 12" line shaft column couplings; 1 LS bearing retainer with rubber bearing; 1 LS furnish stainless steel head shaft; 1 LS re-assemble bowl assembly. See outside link.
Timely processing and hauling of materials at the yard waste site.
Posted Date
Nov 3, 2025
Due Date
Dec 4, 2025
Release: Nov 3, 2025
Close: Dec 4, 2025
Timely processing and hauling of materials at the yard waste site.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis