Discover Opportunities months before the RFP drops
Learn more →Work includes approx 384 CY excavation; 165 LF of 10" SDR 26 PVC storm sewer, trenched; 1 EA manhole adjustment, minor; 30 SY 5" sidewalk pcc; 702 SY 6" driveway, paved, pcc. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work includes approx 384 CY excavation; 165 LF of 10" SDR 26 PVC storm sewer, trenched; 1 EA manhole adjustment, minor; 30 SY 5" sidewalk pcc; 702 SY 6" driveway, paved, pcc. See outside link.
AvailableConstruction of the indoor recreation center sanitary sewer improvements project, and work incidental thereto. Work includes approx. 1,265 LF of 8" diameter sanitary sewer installed in open cut, 967 LF of 4" force main installed in open cut, 260 LF of 4" force main trenchless installation, sanitary sewer service lines and connections, precast concrete manholes, submersible lift station, valve manhole, control building, excavation, backfill, electrical and control, surface restoration and associated improvements and miscellaneous associated work, including cleanup.
Posted Date
Sep 5, 2025
Due Date
Sep 30, 2025
Release: Sep 5, 2025
Close: Sep 30, 2025
Construction of the indoor recreation center sanitary sewer improvements project, and work incidental thereto. Work includes approx. 1,265 LF of 8" diameter sanitary sewer installed in open cut, 967 LF of 4" force main installed in open cut, 260 LF of 4" force main trenchless installation, sanitary sewer service lines and connections, precast concrete manholes, submersible lift station, valve manhole, control building, excavation, backfill, electrical and control, surface restoration and associated improvements and miscellaneous associated work, including cleanup.
Work includes approx of Excavation, Class 10 – 15,000 CY; Compaction Testing – 1 Lump Sum; Trench Compaction Testing – 1 Lump Sum; Storm Sewer, Trenched, 12” – 10 LF; Storm Sewer, Trenched, 15” – 213 LF; Storm Sewer, Trenched, 18” – 173 LF; Removal of Storm Sewer, RCP, 15” Dia – 100 LF; Pipe Apron, RCP, 18” Dia. – 1 EA; Manhole, SW-401, 48” Dia. – 1 EA; Intake, SW-511 – 1 EA; Connection to Existing Intake – 1 EA; Pavement, PCC, 6” – 61 SY; Pavement Removal – 61 SY; Seeding, Seeding and Fertilizing – 1 Lump Sum; Rip Rap, Erosion Stone – 20 TON; Silt Fence – 1,460 LF; Removal of Fence – 810 LF; Wildlife Fence, 96 inch – 778 LF; Wildlife Fence Gate, 32 foot – 1 EA; Mobilization- 1 Lump Sum. See outside link.
Posted Date
Jul 17, 2025
Due Date
Aug 12, 2025
Release: Jul 17, 2025
Close: Aug 12, 2025
Work includes approx of Excavation, Class 10 – 15,000 CY; Compaction Testing – 1 Lump Sum; Trench Compaction Testing – 1 Lump Sum; Storm Sewer, Trenched, 12” – 10 LF; Storm Sewer, Trenched, 15” – 213 LF; Storm Sewer, Trenched, 18” – 173 LF; Removal of Storm Sewer, RCP, 15” Dia – 100 LF; Pipe Apron, RCP, 18” Dia. – 1 EA; Manhole, SW-401, 48” Dia. – 1 EA; Intake, SW-511 – 1 EA; Connection to Existing Intake – 1 EA; Pavement, PCC, 6” – 61 SY; Pavement Removal – 61 SY; Seeding, Seeding and Fertilizing – 1 Lump Sum; Rip Rap, Erosion Stone – 20 TON; Silt Fence – 1,460 LF; Removal of Fence – 810 LF; Wildlife Fence, 96 inch – 778 LF; Wildlife Fence Gate, 32 foot – 1 EA; Mobilization- 1 Lump Sum. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis