Discover Opportunities months before the RFP drops
Learn more →The City of Paso Robles is soliciting bids for the Sierra Bonita, Scott Street, and Fallbrook Court Road Repairs project, which includes utility adjustments, monument perpetuation, dig-out repairs, HMA leveling and surface course, key cut tapers, striping, Type II slurry application, and crack filling. The contractor must provide all necessary work plans, permits, inspections, and complete the work within 90 working days from the Notice to Proceed; liquidated damages of $500 per calendar day apply for delay. The engineer's estimate for the project is $3,365,000.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
The City of Paso Robles is soliciting bids for the Sierra Bonita, Scott Street, and Fallbrook Court Road Repairs project, which includes utility adjustments, monument perpetuation, dig-out repairs, HMA leveling and surface course, key cut tapers, striping, Type II slurry application, and crack filling. The contractor must provide all necessary work plans, permits, inspections, and complete the work within 90 working days from the Notice to Proceed; liquidated damages of $500 per calendar day apply for delay. The engineer's estimate for the project is $3,365,000.
AvailableCity of El Paso de Robles seeks a contractor to furnish labor, materials, equipment, and perform roadway repair and resurfacing work on Sierra Bonita, Scott Street, and Fallbrook Court including utility adjustments, monument perpetuation, dig-out repairs, HMA leveling and surface course, key cut tapers and striping, Type II slurry seal, and crack filling. Project requires completion within 90 working days; bidders must hold a valid California Class A (General Engineering) license, be registered with CA Department of Industrial Relations, comply with CARB off‑road diesel regulations (provide CRCs), pay prevailing wages, and provide required bid security (≈10%), 100% payment and performance bonds.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
City of El Paso de Robles seeks a contractor to furnish labor, materials, equipment, and perform roadway repair and resurfacing work on Sierra Bonita, Scott Street, and Fallbrook Court including utility adjustments, monument perpetuation, dig-out repairs, HMA leveling and surface course, key cut tapers and striping, Type II slurry seal, and crack filling. Project requires completion within 90 working days; bidders must hold a valid California Class A (General Engineering) license, be registered with CA Department of Industrial Relations, comply with CARB off‑road diesel regulations (provide CRCs), pay prevailing wages, and provide required bid security (≈10%), 100% payment and performance bonds.
AvailableThe City of Paso Robles seeks engineering services for a feasibility study on constructing an undercrossing at State Route 46 East/Airport Road. The study aims to evaluate technical, environmental, and financial feasibility, identify cost savings, and provide a basis for decision-making and future grant applications.
Posted Date
Nov 12, 2025
Due Date
Jan 14, 2026
Release: Nov 12, 2025
Close: Jan 14, 2026
The City of Paso Robles seeks engineering services for a feasibility study on constructing an undercrossing at State Route 46 East/Airport Road. The study aims to evaluate technical, environmental, and financial feasibility, identify cost savings, and provide a basis for decision-making and future grant applications.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis