Discover Opportunities months before the RFP drops
Learn more →The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis