Learn more →Work includes approx 7,208 CY rock excavation; 160 SY of 1.5" hot-mix asphalt surface removal; 116 SY combination concrete curb and gutter; 168 SY pavement patching, type A; 106 SF of 5" portland cement concrete sidewalk; 2,700 TN fox river wwtp access road base course crushed stone, gradation CA1; 120 LF of 24" reinforced concrete pipe culvert, tyoe 2 class II; 1 LS champlain street sanitary manhole 2 bypass pumping; 1 EA of 8' hospital lift station bypass pumping; 14 EA sanitary manhole type A, 5' Dia with type 1 frame and closed lid, special; see outside link.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Work includes approx 7,208 CY rock excavation; 160 SY of 1.5" hot-mix asphalt surface removal; 116 SY combination concrete curb and gutter; 168 SY pavement patching, type A; 106 SF of 5" portland cement concrete sidewalk; 2,700 TN fox river wwtp access road base course crushed stone, gradation CA1; 120 LF of 24" reinforced concrete pipe culvert, tyoe 2 class II; 1 LS champlain street sanitary manhole 2 bypass pumping; 1 EA of 8' hospital lift station bypass pumping; 14 EA sanitary manhole type A, 5' Dia with type 1 frame and closed lid, special; see outside link.
AvailableConstruction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Construction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.
AvailableHMA surf rem (cold mill); 1.5"; 2"; 3"; & butt jnt +/-30,515 SY; PCC surf rem; 1.5" & butt jnt - 275 SY; bit mat'l (tack coat) - 22,105 pound; hma binder & surf crse - 2,941 ton; bit hot-mix sand seal coat (special) - 1,423 ton; manholes to be adj - 31 ea.; water valves to be adj - 19 ea.
Posted Date
Jul 3, 2025
Due Date
Jul 15, 2025
Release: Jul 3, 2025
Close: Jul 15, 2025
HMA surf rem (cold mill); 1.5"; 2"; 3"; & butt jnt +/-30,515 SY; PCC surf rem; 1.5" & butt jnt - 275 SY; bit mat'l (tack coat) - 22,105 pound; hma binder & surf crse - 2,941 ton; bit hot-mix sand seal coat (special) - 1,423 ton; manholes to be adj - 31 ea.; water valves to be adj - 19 ea.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis