Discover Opportunities months before the RFP drops
Learn more →Supply polymer water meter lids: 7,000 12.25-inch polymer solid lids (DFW or NICOR L-2240), 50 SP-DFW50181MWLTSML (or Nicor equivalent), and 50 SP-DFW50201WLLID (or Nicor equivalent). Lids must be black, large pentagon bolt, polymer worm gear, and stamped 'Water'. Vendor must be able to fulfill and deliver the entire order by May 30, 2026 (Murray can accept/hold material prior).
Posted Date
Dec 1, 2025
Due Date
Dec 12, 2025
Release: Dec 1, 2025
Close: Dec 12, 2025
Supply polymer water meter lids: 7,000 12.25-inch polymer solid lids (DFW or NICOR L-2240), 50 SP-DFW50181MWLTSML (or Nicor equivalent), and 50 SP-DFW50201WLLID (or Nicor equivalent). Lids must be black, large pentagon bolt, polymer worm gear, and stamped 'Water'. Vendor must be able to fulfill and deliver the entire order by May 30, 2026 (Murray can accept/hold material prior).
Supply Ductile Iron Pipe (Class 52) with gaskets: 10 units 6" x 18' sticks, 365 units 8" x 18' sticks, 2 units 14" x 18' sticks; V-Bio® enhanced polyethylene encasement: 14 rolls (500') for 8"; 100 rolls of 2" wide, 20‑mil tape. Pipe must conform to ANSI/AWWA C104/A21.4; encasement to ANSI/AWWA A105/A21.5. Pipe lengths must not exceed 18.5 feet. Contractor must be able to fulfill and deliver the entire order by April 1, 2026.
Posted Date
Dec 1, 2025
Due Date
Dec 12, 2025
Release: Dec 1, 2025
Close: Dec 12, 2025
Supply Ductile Iron Pipe (Class 52) with gaskets: 10 units 6" x 18' sticks, 365 units 8" x 18' sticks, 2 units 14" x 18' sticks; V-Bio® enhanced polyethylene encasement: 14 rolls (500') for 8"; 100 rolls of 2" wide, 20‑mil tape. Pipe must conform to ANSI/AWWA C104/A21.4; encasement to ANSI/AWWA A105/A21.5. Pipe lengths must not exceed 18.5 feet. Contractor must be able to fulfill and deliver the entire order by April 1, 2026.
Murray City Power seeks engineering firms for design and consultation services for the construction of a new 138 kV substation. The project includes civil and electrical design, equipment specifications, construction assistance, and optional testing and commissioning. Proposals must address technical qualifications, project approach, cost, and schedule.
Posted Date
Nov 7, 2025
Due Date
Nov 18, 2025
Release: Nov 7, 2025
Close: Nov 18, 2025
Murray City Power seeks engineering firms for design and consultation services for the construction of a new 138 kV substation. The project includes civil and electrical design, equipment specifications, construction assistance, and optional testing and commissioning. Proposals must address technical qualifications, project approach, cost, and schedule.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis