Discover Opportunities months before the RFP drops
Learn more →Construction of the Street Sweeper. A Four-Wheel Chassis rated at a minimum of 19,500 pounds GVRW, single engine system with a minimum of an 5 CY (gross capacity) hopper.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
Construction of the Street Sweeper. A Four-Wheel Chassis rated at a minimum of 19,500 pounds GVRW, single engine system with a minimum of an 5 CY (gross capacity) hopper.
AvailableGrind and overlay Iler Street including approx. 7,400 SY of planing bituminous pavement, 900 tons HMA, and one curb ramp includes 15 CY unclassified excavation incl. haul, 10 ton crushed surfacing top course, 7,375 SY planing bituminous pavement, 100 SY pavement repair excavation incl. haul, 10 SY cement conc. sidewalk 4" thick, 1 EA cement conc. curb ramp, pavement markings.
Posted Date
Mar 26, 2025
Due Date
Apr 8, 2025
Release: Mar 26, 2025
Close: Apr 8, 2025
Grind and overlay Iler Street including approx. 7,400 SY of planing bituminous pavement, 900 tons HMA, and one curb ramp includes 15 CY unclassified excavation incl. haul, 10 ton crushed surfacing top course, 7,375 SY planing bituminous pavement, 100 SY pavement repair excavation incl. haul, 10 SY cement conc. sidewalk 4" thick, 1 EA cement conc. curb ramp, pavement markings.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis