Discover Opportunities months before the RFP drops
Learn more →The project includes: Contract I - Additions to the existing water treatment plant including construction of a new control building, chemical feed systems and structures, Rapid Mix Structures, Clearwell, and High Service Pump Station, along with all related building, site, piping, electrical and other associated modifications. Contract II - Additions to the existing water treatment plant including construction of a new Full Scale Pilot filtration system, including demolition, renovation, excavation, backfill, structures, piping, drains, and appurtenances, electrical, mechanical and other associated modifications.
Posted Date
Nov 8, 2025
Due Date
Jan 22, 2026
Release: Nov 8, 2025
Close: Jan 22, 2026
The project includes: Contract I - Additions to the existing water treatment plant including construction of a new control building, chemical feed systems and structures, Rapid Mix Structures, Clearwell, and High Service Pump Station, along with all related building, site, piping, electrical and other associated modifications. Contract II - Additions to the existing water treatment plant including construction of a new Full Scale Pilot filtration system, including demolition, renovation, excavation, backfill, structures, piping, drains, and appurtenances, electrical, mechanical and other associated modifications.
AvailableConstruction of: For installation of approx. 500 LF of 2" water line including taps, valves, services, replacement of 450 SF of sidewalk, and appurtenances. For installation of approx. 1,150 LF of 8" water line including jack and bore, taps, valves, services, and appurtenances. Project also includes abandonment of an existing water line including traffic control, fittings, 4" insert valve, and replacement of pavement.
Posted Date
Aug 15, 2025
Due Date
Sep 16, 2025
Release: Aug 15, 2025
Close: Sep 16, 2025
Construction of: For installation of approx. 500 LF of 2" water line including taps, valves, services, replacement of 450 SF of sidewalk, and appurtenances. For installation of approx. 1,150 LF of 8" water line including jack and bore, taps, valves, services, and appurtenances. Project also includes abandonment of an existing water line including traffic control, fittings, 4" insert valve, and replacement of pavement.
Work consists of installing 2,700 LF of 6" water line, 950 LF of 2" water line, valves, water line abandonment, pavement replacement, and soil erosion and sediment control.
Posted Date
Aug 15, 2025
Due Date
Sep 16, 2025
Release: Aug 15, 2025
Close: Sep 16, 2025
Work consists of installing 2,700 LF of 6" water line, 950 LF of 2" water line, valves, water line abandonment, pavement replacement, and soil erosion and sediment control.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis