Discover Opportunities months before the RFP drops
Learn more →Annual prequalification for highway construction contractors for Calendar Year 2026, covering paving, general roadway, traffic signals, general bridge work, bridge painting, guardrail construction, and site work.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Annual prequalification for highway construction contractors for Calendar Year 2026, covering paving, general roadway, traffic signals, general bridge work, bridge painting, guardrail construction, and site work.
AvailableThe City of Manchester Department of Public Works is soliciting prequalification packages from construction contractors for highway-related projects, covering classifications such as paving, general roadway, signals, bridges, and site work. Submissions must be sealed and received by December 19, 2025; approved prequalification will be effective January 1, 2026.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
The City of Manchester Department of Public Works is soliciting prequalification packages from construction contractors for highway-related projects, covering classifications such as paving, general roadway, signals, bridges, and site work. Submissions must be sealed and received by December 19, 2025; approved prequalification will be effective January 1, 2026.
AvailableThe City of Manchester is seeking prequalification statements from roofing contractors to remove and replace the existing PVC low-slope and clay tile steep-slope roofing systems and to install a new lined metal gutter system at the Carpenter Memorial Library. Prequalification statements are due by 3:00 PM on November 26, 2025, with a projected award in February 2026 and construction to begin on or about April 15, 2026.
Posted Date
-
Due Date
Nov 26, 2025
Close: Nov 26, 2025
The City of Manchester is seeking prequalification statements from roofing contractors to remove and replace the existing PVC low-slope and clay tile steep-slope roofing systems and to install a new lined metal gutter system at the Carpenter Memorial Library. Prequalification statements are due by 3:00 PM on November 26, 2025, with a projected award in February 2026 and construction to begin on or about April 15, 2026.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis