Discover Opportunities months before the RFP drops
Learn more →The City of Lynn Haven requests bids for construction of approximately 947 linear feet of 5-foot-wide sidewalk on Minnesota Avenue including pedestrian safety features, drainage pipe extension with a headwall, and replacement of existing driveways. The solicitation is an Invitation for Bid distributed via DemandStar with plans and at least one addendum listed for download.
Posted Date
Nov 3, 2025
Due Date
Dec 15, 2025
Release: Nov 3, 2025
Close: Dec 15, 2025
The City of Lynn Haven requests bids for construction of approximately 947 linear feet of 5-foot-wide sidewalk on Minnesota Avenue including pedestrian safety features, drainage pipe extension with a headwall, and replacement of existing driveways. The solicitation is an Invitation for Bid distributed via DemandStar with plans and at least one addendum listed for download.
AvailableThe City of Lynn Haven seeks qualified firms to provide construction engineering and inspection (CEI) services for the Tennessee Avenue Sidewalk Project. Services include inspection and support during construction of the new sidewalk improvements.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
Close: Dec 11, 2025
The City of Lynn Haven seeks qualified firms to provide construction engineering and inspection (CEI) services for the Tennessee Avenue Sidewalk Project. Services include inspection and support during construction of the new sidewalk improvements.
Project includes the trenchless rehabilitation of approx 9,300 LF of clay gravity sewer pipes and brick manholes that were installed in the 1960's to prevent failure due to deterioration; 14,000 LF of new 6" water main to improve existing customer water supply reliability and fire flow protection coverage. The new water main will be replacing approx of 500 LF of deteriorated 6" asbestos cement (ac) water main; 13,500 LF of undersized 2" PVC water distribution lines where there is currently no fire flow available and there is low pressure at peak flow times. The project also includes rehabilitating approx 2.4 miles of roadways and installing the 10th street stormwater improvements. See attached file.
Posted Date
Apr 3, 2025
Due Date
May 5, 2025
Release: Apr 3, 2025
Close: May 5, 2025
Project includes the trenchless rehabilitation of approx 9,300 LF of clay gravity sewer pipes and brick manholes that were installed in the 1960's to prevent failure due to deterioration; 14,000 LF of new 6" water main to improve existing customer water supply reliability and fire flow protection coverage. The new water main will be replacing approx of 500 LF of deteriorated 6" asbestos cement (ac) water main; 13,500 LF of undersized 2" PVC water distribution lines where there is currently no fire flow available and there is low pressure at peak flow times. The project also includes rehabilitating approx 2.4 miles of roadways and installing the 10th street stormwater improvements. See attached file.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis