Discover Opportunities months before the RFP drops
Learn more →Include performing all work necessary to model the existing bicycle and open space trail system, model the future systems, and prepare an update to the Bikeways Master plan document including recommendations of future capital improvement projects and their approximate costs.
Posted Date
Nov 4, 2025
Due Date
Dec 12, 2025
Release: Nov 4, 2025
Close: Dec 12, 2025
Include performing all work necessary to model the existing bicycle and open space trail system, model the future systems, and prepare an update to the Bikeways Master plan document including recommendations of future capital improvement projects and their approximate costs.
Work consist of 2643 SF of remove base & surfacing, 323 LF of conform grind, remove existing fence, gate & motor, 1276 SF of concrete sidewalk, 382 CY of class 2 aggregate base, 42 TN of hot mix asphalt, 318 LF of curb & gutter, 39 EA of concrete wheel stop, 87 LF of traffic stripe, 1129 SF of pavement marking, 113 LF of 12" hdpe storm drain pipe, 1 EA of 48" storm drain manhole, 1 EA of remove and replace existing DI, 684 LF of chain link fence w/ vinyl inserts, 6 EA of bollard, 211 LF of irrigation sleeve, 19 CY of bark, rolling gate w/ motor and keypad, electrical system, 559 SF of remove base & surfacing, 135 LF of conform grind, 505 SF of concrete sidewalk. See outside link.
Posted Date
Sep 17, 2025
Due Date
Oct 15, 2025
Release: Sep 17, 2025
Close: Oct 15, 2025
Work consist of 2643 SF of remove base & surfacing, 323 LF of conform grind, remove existing fence, gate & motor, 1276 SF of concrete sidewalk, 382 CY of class 2 aggregate base, 42 TN of hot mix asphalt, 318 LF of curb & gutter, 39 EA of concrete wheel stop, 87 LF of traffic stripe, 1129 SF of pavement marking, 113 LF of 12" hdpe storm drain pipe, 1 EA of 48" storm drain manhole, 1 EA of remove and replace existing DI, 684 LF of chain link fence w/ vinyl inserts, 6 EA of bollard, 211 LF of irrigation sleeve, 19 CY of bark, rolling gate w/ motor and keypad, electrical system, 559 SF of remove base & surfacing, 135 LF of conform grind, 505 SF of concrete sidewalk. See outside link.
Qualified contractors, vendors, and/or Internet Service Providers (ISPs) to partner with the City on a plan to collaborate on utility coordination opportunities, to develop, extend, and monetize a fiber optic network that can connect City facilities and assets, and expand fiber-to-the-premises options for the City's businesses and residents.
Posted Date
Sep 5, 2025
Due Date
Oct 10, 2025
Release: Sep 5, 2025
Close: Oct 10, 2025
Qualified contractors, vendors, and/or Internet Service Providers (ISPs) to partner with the City on a plan to collaborate on utility coordination opportunities, to develop, extend, and monetize a fiber optic network that can connect City facilities and assets, and expand fiber-to-the-premises options for the City's businesses and residents.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis