Discover Opportunities months before the RFP drops
Learn more →Provide replacement of approx. 2,900 LF of asphalt pavement and reconstruct approx. 5,800 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Furnish and install erosion control measures, and all related work, as shown and as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work; 6,833 SY Demolish, remove and dispose of existing asphalt pavement, and all related work, as shown and as specified; 683 GAL Furnish and install tack coat, (CCS-1H) (0.05-0.15 GAL/SY) and all related work, as shown and as specified; 196 TN Furnish and install HMAC Type "D" (PG 70-22) (pre-lay), and all related work as shown and as specified. See attached files.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Provide replacement of approx. 2,900 LF of asphalt pavement and reconstruct approx. 5,800 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Furnish and install erosion control measures, and all related work, as shown and as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work; 6,833 SY Demolish, remove and dispose of existing asphalt pavement, and all related work, as shown and as specified; 683 GAL Furnish and install tack coat, (CCS-1H) (0.05-0.15 GAL/SY) and all related work, as shown and as specified; 196 TN Furnish and install HMAC Type "D" (PG 70-22) (pre-lay), and all related work as shown and as specified. See attached files.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis