Discover Opportunities months before the RFP drops
Learn more →Project consists of but is not limited to the construction of a 12 -0 x 6 8 brick sign with a single led digital display with an alternative option for a doublesided led digital display
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Project consists of but is not limited to the construction of a 12 -0 x 6 8 brick sign with a single led digital display with an alternative option for a doublesided led digital display
AvailableThe City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
The City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
AvailableNormal grouting (up to 6 tubes) included in surface preparation. (16) manholes identified for service. Vertical footage ranges from 3' to 12', diameters between 4' to 5', wall materials are pre-cast and clay/brick.
Posted Date
Nov 7, 2025
Due Date
Nov 17, 2025
Release: Nov 7, 2025
Close: Nov 17, 2025
Normal grouting (up to 6 tubes) included in surface preparation. (16) manholes identified for service. Vertical footage ranges from 3' to 12', diameters between 4' to 5', wall materials are pre-cast and clay/brick.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis