Learn more →Cafe rehabilitation. Work includes, but is not lited to: removal of existing roofing; demolition of interior second level walls, ceilings and floor finishes; new EIFS and stucco exterior finishes; roofing replaceent including insulation, flashings, caps, gutters and downspouts; new second-floor apartment buildout with finishes, bath and kitchen fixtures and cabinets; replacement of apartment exterior windows and skylights; replacement of second-floor mechanical, plumbing and electrical systems.
Posted Date
Jun 16, 2025
Due Date
Jul 14, 2025
Release: Jun 16, 2025
Close: Jul 14, 2025
Cafe rehabilitation. Work includes, but is not lited to: removal of existing roofing; demolition of interior second level walls, ceilings and floor finishes; new EIFS and stucco exterior finishes; roofing replaceent including insulation, flashings, caps, gutters and downspouts; new second-floor apartment buildout with finishes, bath and kitchen fixtures and cabinets; replacement of apartment exterior windows and skylights; replacement of second-floor mechanical, plumbing and electrical systems.
The Project includes the following approximate quantities of Work: 21,184 cubic yards (CY) of topsoil strip, stockpile, and respread; 40,987 CY of excavation; 524 LF (LF) of 24" (IN) RCP storm sewer; 35 LF of 18" RCP arch culvert; 1,199 LF of 12" water main; 144 LF of 8" water main; 1,455 LF of 8" sanitary sewer; 4 sanitary manhole structures and 2 storm sewer intakes; 3,716 square yards (SY) of 7" paving with 12" subgrade preparation and 6" of modified subbase. Temporary erosion control will consist of 1,378 SY of rolled erosion control product, 1,208 LF of 9" wattle, inlet protection, and erosion control mulching. Project will be stabilized with seeding.
Posted Date
Jan 22, 2025
Due Date
Feb 10, 2025
Release: Jan 22, 2025
Close: Feb 10, 2025
The Project includes the following approximate quantities of Work: 21,184 cubic yards (CY) of topsoil strip, stockpile, and respread; 40,987 CY of excavation; 524 LF (LF) of 24" (IN) RCP storm sewer; 35 LF of 18" RCP arch culvert; 1,199 LF of 12" water main; 144 LF of 8" water main; 1,455 LF of 8" sanitary sewer; 4 sanitary manhole structures and 2 storm sewer intakes; 3,716 square yards (SY) of 7" paving with 12" subgrade preparation and 6" of modified subbase. Temporary erosion control will consist of 1,378 SY of rolled erosion control product, 1,208 LF of 9" wattle, inlet protection, and erosion control mulching. Project will be stabilized with seeding.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis