Discover Opportunities months before the RFP drops
Learn more →Procurement of roadway and drainage improvements at the intersection of CR 137 at FM 1660 and along CR 137, including roundabout construction, lane additions, widening, curb and gutter, and pedestrian improvements.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
Procurement of roadway and drainage improvements at the intersection of CR 137 at FM 1660 and along CR 137, including roundabout construction, lane additions, widening, curb and gutter, and pedestrian improvements.
AvailableThe City of Hutto, TX is soliciting low‑bid proposals to supply sodium hypochlorite (bleach) for potable water treatment at various locations in accordance with AWWA standards. The IFB includes specifications, delivery requirements, and supporting exhibits and is open for electronic submission on the Bonfire portal.
Posted Date
Nov 10, 2025
Due Date
Dec 2, 2025
Release: Nov 10, 2025
Close: Dec 2, 2025
The City of Hutto, TX is soliciting low‑bid proposals to supply sodium hypochlorite (bleach) for potable water treatment at various locations in accordance with AWWA standards. The IFB includes specifications, delivery requirements, and supporting exhibits and is open for electronic submission on the Bonfire portal.
Improvements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Improvements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis