Discover Opportunities months before the RFP drops
Learn more →Provision of comprehensive engineering services for the implementation of approved FY 2026 CDBG project(s), encompassing cost estimation, plan preparation, bid management, contract assistance, and construction inspection through project closeout.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Provision of comprehensive engineering services for the implementation of approved FY 2026 CDBG project(s), encompassing cost estimation, plan preparation, bid management, contract assistance, and construction inspection through project closeout.
AvailableThe work shall consist essentially of the following type items for emergency watershed protection program - 2024: select bank stabilization with riprap and/or grouted riprap, excavation and reshaping of ditches to typical sections 1 LS clearing and shaping, 3,025 CY unclassified excavation, 2,638 ton rock riprap (200 LB), 61 CY concrete grout.
Posted Date
Jun 19, 2025
Due Date
Aug 12, 2025
Release: Jun 19, 2025
Close: Aug 12, 2025
The work shall consist essentially of the following type items for emergency watershed protection program - 2024: select bank stabilization with riprap and/or grouted riprap, excavation and reshaping of ditches to typical sections 1 LS clearing and shaping, 3,025 CY unclassified excavation, 2,638 ton rock riprap (200 LB), 61 CY concrete grout.
Work includes installation of a 600 gpm fiberglass induced draft aerator and steel support system on existing concrete clearwell; cleaning and lining of existing concrete ground clearwell; installation of two 600 gpm vertical turbine service pumps on existing concrete clearwell; installation of powder lime feed system including fiberglass building; installation of chlorine feed system including fiberglass building and concrete slab; installation of phosphate feed system including fiberglass building and concrete slab. See attached bid ad.
Posted Date
Oct 24, 2024
Due Date
Nov 26, 2024
Release: Oct 24, 2024
Close: Nov 26, 2024
Work includes installation of a 600 gpm fiberglass induced draft aerator and steel support system on existing concrete clearwell; cleaning and lining of existing concrete ground clearwell; installation of two 600 gpm vertical turbine service pumps on existing concrete clearwell; installation of powder lime feed system including fiberglass building; installation of chlorine feed system including fiberglass building and concrete slab; installation of phosphate feed system including fiberglass building and concrete slab. See attached bid ad.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis