Discover Opportunities months before the RFP drops
Learn more →Highland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Highland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
AvailableConstruction of an approximately 0.75-mile asphalt trail, including boardwalk sections, retaining walls, and fencing.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Construction of an approximately 0.75-mile asphalt trail, including boardwalk sections, retaining walls, and fencing.
AvailableHighland City is soliciting bids for construction of the Mitchell Hollow Trail, an approximately 0.75-mile asphalt trail with boardwalk sections, retaining walls, and fencing within the Mitchell Hollow dry wash corridor. A mandatory pre-bid meeting is scheduled for 2025-12-02 and submissions are due 2025-12-16 no later than 5:00 PM MT.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Highland City is soliciting bids for construction of the Mitchell Hollow Trail, an approximately 0.75-mile asphalt trail with boardwalk sections, retaining walls, and fencing within the Mitchell Hollow dry wash corridor. A mandatory pre-bid meeting is scheduled for 2025-12-02 and submissions are due 2025-12-16 no later than 5:00 PM MT.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis