Discover Opportunities months before the RFP drops
Learn more →The City of Guttenberg, Iowa is soliciting bids for paving and storm sewer improvements along South River Park Drive. Bid documents and details are being distributed via Origin Design’s online planroom under project number 24203. Bids are due January 7, 2026, as indicated on the planroom listing.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The City of Guttenberg, Iowa is soliciting bids for paving and storm sewer improvements along South River Park Drive. Bid documents and details are being distributed via Origin Design’s online planroom under project number 24203. Bids are due January 7, 2026, as indicated on the planroom listing.
AvailableThe City of Guttenberg, Iowa is soliciting bids for paving and storm sewer improvements along South River Park Drive. Bid documents and details are being distributed via Origin Design’s online planroom under project number 24203. Bids are due January 7, 2026, as indicated on the planroom listing.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The City of Guttenberg, Iowa is soliciting bids for paving and storm sewer improvements along South River Park Drive. Bid documents and details are being distributed via Origin Design’s online planroom under project number 24203. Bids are due January 7, 2026, as indicated on the planroom listing.
AvailableThe Motor Control Center Replacement will include the following items: 1200 A 480V 3 Phase Main Breaker, 1200 A 480V 3 Phase Automatic Transfer Switch, External Generator Connection Cabinet, 120/240V Single Phase Transformer, 120/240V Single Phase Sub-Panel, 200 HP 480V 3 Phase Variable Frequency Drives for each pump, Primary Pulsar PSL 5.0 Automatic Station Level Control, Secondar Pulsar REFLECT Level Controller, Operation Sequencer, Cellular Notification, Connection to Other Existing General Circuits (lighting, fans, receptacles, etc.), and Replacement of a building access door.
Posted Date
Mar 12, 2025
Due Date
Jun 26, 2025
Release: Mar 12, 2025
Close: Jun 26, 2025
The Motor Control Center Replacement will include the following items: 1200 A 480V 3 Phase Main Breaker, 1200 A 480V 3 Phase Automatic Transfer Switch, External Generator Connection Cabinet, 120/240V Single Phase Transformer, 120/240V Single Phase Sub-Panel, 200 HP 480V 3 Phase Variable Frequency Drives for each pump, Primary Pulsar PSL 5.0 Automatic Station Level Control, Secondar Pulsar REFLECT Level Controller, Operation Sequencer, Cellular Notification, Connection to Other Existing General Circuits (lighting, fans, receptacles, etc.), and Replacement of a building access door.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis