Discover Opportunities months before the RFP drops
Learn more →HMA Resurfacing.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
HMA Resurfacing.
AvailableWork includes 20 LF curb and gutter, rem; 10 SY pavt, rem; 40 SY sidewalk, rem erosion control, inlet protection,; 3 EA fabric drop; 40 SY aggregate base, 4"; 115 SY aggregate base, 6"; 110 SY hma surface, rem; 330 SF sidewalk, conc, 4"; 30 SY sodding; 30 sy topsoil surface, furn, 3"; 1 unit water, sodding/seeding; 30 LF irrigation pipe; 30 SY hydroseeding; 1 EA fire hydrant; 1 EA gate box, abandon; 410 LF water main hdpe dr 11, 8", directional drilled; 70 LF water main hdpe dr 11, 8", tr det g; 2 ea water main connection, 8". See outside link.
Posted Date
Oct 15, 2025
Due Date
Oct 28, 2025
Release: Oct 15, 2025
Close: Oct 28, 2025
Work includes 20 LF curb and gutter, rem; 10 SY pavt, rem; 40 SY sidewalk, rem erosion control, inlet protection,; 3 EA fabric drop; 40 SY aggregate base, 4"; 115 SY aggregate base, 6"; 110 SY hma surface, rem; 330 SF sidewalk, conc, 4"; 30 SY sodding; 30 sy topsoil surface, furn, 3"; 1 unit water, sodding/seeding; 30 LF irrigation pipe; 30 SY hydroseeding; 1 EA fire hydrant; 1 EA gate box, abandon; 410 LF water main hdpe dr 11, 8", directional drilled; 70 LF water main hdpe dr 11, 8", tr det g; 2 ea water main connection, 8". See outside link.
Release: Oct 15, 2025
Close: Oct 28, 2025
Lead service line replacement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis