Discover Opportunities months before the RFP drops
Learn more →Work includes approx. 1,850 SY of Removal of Asphalt Mat (Planing) (2”); 1,951 LF of Erosion Log Type 1 (12 inch); 4 EA of Reset Manhole; 1,486 SF of Reset Rock Mulch; 455 TON of Hot Mix Asphalt (Grading SX)(75)(PG 58-28)(20% RAP). See outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes approx. 1,850 SY of Removal of Asphalt Mat (Planing) (2”); 1,951 LF of Erosion Log Type 1 (12 inch); 4 EA of Reset Manhole; 1,486 SF of Reset Rock Mulch; 455 TON of Hot Mix Asphalt (Grading SX)(75)(PG 58-28)(20% RAP). See outside link.
Available2026 Pavement Preservation Project.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
2026 Pavement Preservation Project.
AvailableRemoval and replacement of curb and gutter, valley pan, crosspan, miscellaneous sidewalk, and ADA crossing replacement.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
Close: Dec 19, 2025
Removal and replacement of curb and gutter, valley pan, crosspan, miscellaneous sidewalk, and ADA crossing replacement.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis