Learn more →The City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
The City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
AvailableRehabilitation of the sanitary sewer lift station. Work includes erosion control systems, filter fabric silt fence, clearing and grubbing, excavation and backfill for structures, bar wrapped steel cylinder pipe, ductile iron pipe and fittings, polyethylene pipe, reinforced concrete pipe, cast-in-place concrete manholes, precast concrete manholes, adjusting manholes, inlets and valve boxes to grade, manhole rehabilitation, gate valves, sanitary sewer force mains, television inspection of sanitary sewer lines, sanitary sewer pipe lining.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Rehabilitation of the sanitary sewer lift station. Work includes erosion control systems, filter fabric silt fence, clearing and grubbing, excavation and backfill for structures, bar wrapped steel cylinder pipe, ductile iron pipe and fittings, polyethylene pipe, reinforced concrete pipe, cast-in-place concrete manholes, precast concrete manholes, adjusting manholes, inlets and valve boxes to grade, manhole rehabilitation, gate valves, sanitary sewer force mains, television inspection of sanitary sewer lines, sanitary sewer pipe lining.
AvailableRehabilitation of sanitary sewer lift station. Provide, operate, and maintain diversion pumping to continue sanitary sewer service as required while construction operations are in progress including pumping equipment and fuel, piping, fittings, valves, plugs, and connection to existing force main. Demolish existing control building and foundation, including all costs for hauling and disposing of materials off-site. Demolish existing concrete pipe supports and foundation, including all costs for hauling and disposing of materials off-site. See attached file.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Rehabilitation of sanitary sewer lift station. Provide, operate, and maintain diversion pumping to continue sanitary sewer service as required while construction operations are in progress including pumping equipment and fuel, piping, fittings, valves, plugs, and connection to existing force main. Demolish existing control building and foundation, including all costs for hauling and disposing of materials off-site. Demolish existing concrete pipe supports and foundation, including all costs for hauling and disposing of materials off-site. See attached file.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis